DC engineering
±500kV Genan Line anti-dancing renovation project

1631851291384985.jpg

The new straight tower across the high-speed railway section is 21 meters higher than the old tower, which meets the safety operation of Jingjing Railway. At the same time, the independent stretch section is adopted in the crossing area, which also provides guarantee for the safe operation of the transmission line.

電 話
產(chǎn) 品
短 信
聯(lián) 系
国产午夜无码片在线观看影视,国产欧美va欧美va在线动漫,日韩精品三区四区五区,国产91精品高清一区二区三区